Hi,
I am now running 9.2 but I need to
run sqlplus 9.0 to connect to an
Oracle 7.3 instance. Is it possible
for me to load just sqlplus 9.0 to
just use for working with the Oracle 7.3
and have 9.2 to work with the 9i
databases.
(As one can no longer connect
to Oracle 7.3 with Sqlplus 9.2)
If so, what is the most efficient way
to set it up?
I appreciate any input in this regard.
For some reason replies to my actual
work email are being blocked so can
all replies be sent to the list, please.
Regards,
Ilan Pillemer
Snr Analyst Programmer
Sappi Saiccor (Reg no. 1989/01135/07)
Tel +27 (0)39 973 8016
Fax +27 (0)39 973 8054
Ilan.[Email Address Removed]Oracle LazyDBA home page